Following in-depth analysis of the company's processes and requirements, six large shop floors with numerous additions have been transformed into a modern, rational and logistical scheme. This involved the integration of core production processes with a warehouse strip at the rear.
A three-storey block for office and other secondary functions including a new canteen, was added to the front of the factory.All aspects of energy use and light were studied and optimised.